Building Sync
Title: Building Sync
Category: /Literature/English
Details: Words: 1810 | Pages: 7 (approximately 235 words/page)
Building Sync
Category: /Literature/English
Details: Words: 1810 | Pages: 7 (approximately 235 words/page)
Building a Synchronized 026 ReportBuilding a Synchronized 026 Report
by Captain Brandon Grubbs and Captain Peter J. Ramirez
Synchronizing the transfer of ULLS data through the supply and maintenance
systems
is critical to providing the commander with accurate information.
The brigade must attack in 36 hours. The brigade executive officer has just
returned from the brigade maintenance meeting, where an AHO-026, Equipment
Deadlined over XX Days by Battalion Report, was used to update him on inoperable
equipment, the
showed first 75 words of 1810 total
You are viewing only a small portion of the paper.
Please login or register to access the full copy.
Please login or register to access the full copy.
showed last 75 words of 1810 total
Course.
Captain Peter J. Ramirez is a small group leader with the Combined Logistics
Captains Career Course at the Army Logistics Management College, Fort Lee,
Virginia. He previously was the forward support battalion maintenance company
observer-controller at the National Training Center. He has a B.S. degree in
management from Park College in Missouri and is a graduate of the Ordnance
Officer Basic Course, the Combined Logistics Officers Advanced Course, and the
Support Operations Course.